New building
Efficient cooling solution for Interlaken Hospital
Interlaken Hospital is investing in its future and adapting its infrastructure to meet modern requirements. In the new building now replacing the oldest complex on the hospital campus, a CTA standard chiller ensures everything is at the right temperature – in summer and in winter.
Learn more
New building
Cooling and heating for the new Festhalle in Bern
When up to 9,000 people attend a concert or conference inside the new Festhalle Bern, it can get pretty warm. A custom CTA cooling/heating unit acts as a chiller in summer and a heat pump during winter, thus ensuring pleasant temperatures all year round.
Learn more
Refurbishment
Heat pump replacement in a 1950s house
Every heating system needs to be replaced at some point. Heat pumps are no exception. In this detached house, the old heat pump was replaced by a new one. Latest-generation heat pumps are even more energy-efficient and economical.
Learn more
Replacement system
Extremely quiet replacement system with a sustainable refrigerant
The previous chiller had reached the end of its service life and had to be replaced. A new low-noise propane chiller was installed and commissioned in record time. The backbone of the project was the long-standing partnership with the supplier of the chiller.
Learn more
Replacement system
Sustainable cooling technology for cheese production
Cheese production requires reliable cooling. To achieve this, the Studer cheese dairy uses a propane-based cooling system with ice storage. Thanks to its natural refrigerants, a sound and simple safety concept and regular maintenance, this system guarantees optimum quality and seamless operation.
Learn more5 from 20 References